Our on site start up package includes:

Calibration and Training
An Armcon engineer on site for 2 or 3 days to calibrate your machine and train your personnel.

  • The engineer will be on site at your convenience
  • Professional advice on suitability of aggregates to be used in concrete

A member of your personnel must be present during all the following tasks as part of the training process:

  • Walk around machine, explaining all components of the machine providing basic machine understanding.
  • Full calibration using all aggregates and cement you wish to use.
  • Batch sheets produced from our Technical Department.
  • Batch information input into digital ticket printer (where fitted) to provide your mix designs.
  • Concrete produced by your personnel.
  • Slumps tested and adjusted.
  • Yield test completed to ensure accurate quantities from machine.
  • Calibration certificates supplied.
  • Training certificates supplied.